Monday, April 07, 2008

we are now call PAC

Tuesday, January 15, 2008

im back

after been so long no posting or updating...
im back here again to updating my blog...

currently we are expanded...

alhamdulilah...

we are more towards as design consultant...
rather than design and built contractor...

we will be doing the design and built project if its been request by the owner...

thank you.

Monday, January 23, 2006

coming soon

we will be return soon...

updating with alots of underconstruction and completed project...

thanks you....

Sunday, September 11, 2005

TURN OVER THE 42 K LOW COST APARTMENT ( PART 4 )

THE TURN OVER PROCESS...




This is the actual plan of the low cost apartment....
Total built area is 660SQFT.

WORKS DESCRIPTION

THE BLUE indicates the plastered ceiling and the cornice area.
THE BROWN indicates cabinet works - the kitchen and the wardrobe.
THE GREEN indicates one of the bedrooms that has been converted into the dining area...
THE YELLOW indicates the wall that has been demolished.

DEMOLISH WORKS
1. To demolish existing wall at the toilet and the bedroom 3.
2. To demolish existing floor and wall tiles at the kitchen area.
3. To demolish existing floor and wall tiles at the toilet.
4. To demolish existing window at the living area.

TILING WORKS
1. To supply and install new floor tiles ( WHITE HORSE ) for the whole house ( existing floor is cement rendered ) including the yard area.
2. To supply and install new floor and wall tiles ( full height ) for the kitchen area ( WHITE HORSE ).
3. To supply and install new floor and wall tiles ( full height ) for the bathroom area ( WHITE HORSE ).

CEILING WORKS
1. To supply and install new ceiling + cornice + downlight at the living area, kitchen, entrance and the circulation area.

CABINETS
1. To suppy and install new kitchen cabinet.
2. To supply and install new wardrobe in the both bedroom. ( FULL HEIGHT )

WINDOW AND GRILL
1. To supply and install new grill for the whole house.
2. To supply and install new sliding window for the living area.

PAINT WORKS
1. To supply and paint the whole house ( ICI PAINT ) - MIXED COLOR PAINT NOT THE STANDARD COLOR PAINT.
2. To supply and paint all the windows and doors. ( ICI PAINT )

ELECTRICAL WORKS
1. To supply and install new electrical equipment such as lamps and fans for the whole house.
2. To supply and install 3 new plug points and the water heater point.

PLUMBING WORKS
1. To supply and install new plumbing for the toilet, kitchen and the yard area.

OTHERS
1. To supply and install new decorative door for the main entrance.

TOTAL COST IS ONLY 18K.
RENOVATION TIMES IS ONLY 10 days.
FREE DESIGN AND CONSULTATION.


THE OWNER BOUGHT THE APARTMETN FOR ONLY RM42k....
TOTAL RENOVATION COST IS ONLY RM18K...
TOTAL VALUE IS ONLY RM60K...


SO YOU ALREADY CAN TURN OVER YOUR LOW COST INTERIOR INTO THE MEDIUM COST APARTMENT INTERIOR FOR ONLY RM18K WITH US.

100% GUARANTEED !!!

CALL US NOW AT 012-3069050

Thursday, September 08, 2005

TURN OVER THE 42 K LOW COST APARTMENT ( PART 3 )

THE TURN OVER PROCESS...
DAY 10 ......100% completed ( CONSTRUCTION only )......
only waiting for the loose furniture coming in...

The final look for the living area....

On off the wall in the living area is painted by red color ( ICI color paint ) for the FUTURE WALL...

The final look for the ceiling at the living area...

One of the room being converted to become the dining area...make it more privacy from the living area....

Apple Green ( ICI color paint ) is use for the dining FUTURE WALL...

The entrance for the circulation area between the dining, toilet and all the room...

The kitchen cabinet after been installed...


Built in wardrobe in one of the bedroom... + the fture wall using the bright orange color ( ICI color paint )

will be post soon the detail about the material, the method and total construction cost....

TURN OVER THE 42 K LOW COST APARTMENT ( PART 2 )

THE TURN OVER PROCESS...
DAY 5 ......IN PROGRESS......


THE LIVING AREA IN PROCESS,
HERE YOU CAN SEE THE WINDOW IS ALREADY CHANGE...
AND THE CEILING IS ALREADY INSTALL WITH THE CORNICE ALL AROUND WITH THE DOWNLIGHT IN THE EVERY CORNER OF THE AREA...




THE CEILING IMAGES AFTER BEEN INSTALL WITH THE CORNICE ALL AROUND THE LIVING AREA...

THE CENTER AREA ( CIRCULATION AREA ) OF THE LOW COST APARTMENT IS CHANGING ALOTS...

HERE ALSO U CAN SEE ONE OF THE ROOM IS UNDER PROCESS TO BECOME THE DINING AREA....

THE KITCHEN AREA AFTER BEEN INSTALLED WITH THE NEW TILES ( TILES IS USING THE WHITE HORSE ), BUT ALOTS OF THING, STILL IN PROGRESS TO COMPLETE.....

THE CENTRE WALL OF THE TOILET HAVE BEEN DEMOLISHED.. TO MAKE IT, THE TOILET BIGGER AND COMFORTABLE...

HERE YOU CAN SEE THE TOILET TILES ALREADY CHANGED ( TILES IS USING WHITE HORSE )





TURN OVER THE 42 K LOW COST APARTMENT ( PART 1 )

THIS PROJECT IS TO TURN OVER THE INTERIOR OF THE LOW COST APARTMENT ( RM 42K - VALUE OF THE APARTMENT ) INTO THE INTERIOR OF THE MEDIUM COST APARTMENT....

EXISTING IMAGES...


THE KITCHEN AREA ( A SMALL AND MESSY KITCHEN AREA FOR THE LOW COST APARTMENT )


THE DINING AREA ( TOO DULL YUP THE PICTURE REALLY CAN TELL THIS IS THE LOW COST APARTMENT )

THE TOILET AREA ( TOO SMALL AND CONJESTED )

Kitchen Cabinet installation and final...

The installation in progress....



The FINAL PRODUCT...

completed within 1 days

OUR KITCHEN CABINET PROCESS...

1. GIVE US A CALL 012 - 306 9050 FOR FREE CONSULTATION...

2. THAN WE WILL BE COMING TO YOUR HOUSE AND MEASURE YOUR KITCHEN SIZE ( ITS FREE )

3. WITHIN 2 - 3 DAYS WE WILL BE GIVING YOU OUR DESIGN AND QUOTATION + THE MATERIAL SAMPLE TO MAKE SURE YOU GET WHAT YOU REALLY WANT!!! ( ITS FREE )

4. 1 WEEK AFTER CONFIRMATION OF THE DESIGN , WE WILL BE INSTALLING THE KITCHEN CABINET TO YOUR HOUSE....

To get our special kitchen design and our factory price please give us the exact size of your kitchen or just feel free to give us a call.....

The House Final Design

After being up and down finalize the design...


Existing house....


This is the final look of the house...


Friday, August 12, 2005

Space Effectively...

INSUFFICIENT OR INEFFECTIVE.
Do you have insufficient storage space or ineffective storage space? There's a big different. Insufficient storage space means you don't have enough space for your things. Ineffective space means you have enough space for your things, but you're not making the best use of that space. Most closets and cabinets have the volume to hold twice as much as they are usually constructed for. And you probably have quite a few nooks and crannies for storage that you haven't even thought of. Of course, it's important to make sure you don't have things you don't like, are outdated, etc., but it is also important to have effective storage space for the things you do like and enjoy.

READ MORE

Current Colour Trend....

Neutrals - are still very much with us and seem to be going in a couple of directions, away from or in addition to the beige on beige tonalities, which are still very popular. And there's a reason for this. Neutrals are comfortable to live in, make a great backdrop for adding color or artwork, and can be updated and changed easily.

Retro - as now, not then - is very strong, not only in styles, but in colors. A lot of very real, very bright colors are showing up - lime to pea greens, oranges in various hues, electric blues, true reds, pinks from soft to shocking, and yellows.

Warm to hot colors - reds, reds, on top of pinks, pinks - lots of pinks, on top of oranges, with yellows. It's an exciting palette, which can be used in a muted or very bold way.

READ MORE....

Recomendation Site...

If you would like to have a good interior idea and decoration...
here i found a really sourceful site for you...
a recomendation site from me...

http://interiordec.about.com/

surf it....and you can get alots of briliant idea for your interior decoration....

cheers!!!