<body>

Thursday, September 08, 2005

TURN OVER THE 42 K LOW COST APARTMENT ( PART 3 )

THE TURN OVER PROCESS...
DAY 10 ......100% completed ( CONSTRUCTION only )......
only waiting for the loose furniture coming in...

The final look for the living area....

On off the wall in the living area is painted by red color ( ICI color paint ) for the FUTURE WALL...

The final look for the ceiling at the living area...

One of the room being converted to become the dining area...make it more privacy from the living area....

Apple Green ( ICI color paint ) is use for the dining FUTURE WALL...

The entrance for the circulation area between the dining, toilet and all the room...

The kitchen cabinet after been installed...


Built in wardrobe in one of the bedroom... + the fture wall using the bright orange color ( ICI color paint )

will be post soon the detail about the material, the method and total construction cost....

0 Comments:

Post a Comment

<< Home